Solution 1: Visual Aids – As we examined how operators handled the production equipment we noticed the gauges lacked any clear ranges specifying whether operations were running in-spec. Instead, machine operators relied on their own knowledge and experience to interpret the readings.
To improve efficiency we worked with the client to set standardized parameters for each gauge. We then applied green, yellow, and red coloring around the numerical figures along the outside of the dials. By clearly spelling out operational ranges, employees would know at a glance whether the machine was functioning correctly, whether they’d been with the company for a decade or a single day.
Solution 2: Enhanced Metrics Tracking – We also encouraged the client to begin monitoring certain factors directly correlated to uptime and quality. For starters, depending on the weight of the paper being produced, operators may adjust the asset’s production speed. So long as operators kept this rate – known as “best run setting” – consistent over the course of the day, the company maintained efficiency. That said, there was no system in the mix for tracking this information. We developed a Speed Process Monitor chart for operators to record any changes to best run setting, so managers and supervisors could address major issues before they escalated.
We introduced a similar approach to improve paper quality as it was still being produced. The client already used photosensitive scanning equipment to evaluate the condition of the reels in production, after ensuring this was working properly we added a visual inspection component as well. After all, the integrity of the reel was typically indicative of a greater issue like pulp consistency. Catching these problems early limited waste.
We realized that their daily operational report only monitored overall volume, so we separated the report into shifts, and created buckets for loss percentage, paper breaks, and uptime figures. This created visibility so that these quality and efficiency could be addressed at the beginning of each workday.
Solution 3: Downtime Kitting Program – To reduce overall maintenance spending we helped the client to better utilize equipment operator’s idle time during a planned or unplanned shutdown.
Employees were tasked with assembling maintenance kits for components at the top of the work order list. This not only kept the staff, but prepared the maintenance staff for these repairs with the tools and parts necessary to finish the task quickly.