USC arrived on the scene, took a couple of weeks to do a feasibility study, and came back with a project that was going to be 19 weeks in length with a focus on key areas:
Creating a Management Operating System (MOS). This was focused on the shop floor to address those operations breakdowns, giving management the control and visibility they had let slide over the years.
Creating a Maintenance Management Operating System. This area rose to the forefront quickly. The maintenance manager was proud they had no maintenance backlog. Normally, when we see equipment breakdowns, we also find that maintenance hasn’t been performed regularly. Not here. We dug a little deeper and found that they weren’t doing the correct type of maintenance that would address and prevent those breakdowns.
Increasing quality and throughput. It’s a key goal of most engagements, and this was no different. The point is to create an efficient, high-quality operation — the proverbial well-oiled machine.
Increasing Employee engagement and training. We knew this was also a key area in both hiring and retention. By creating the MOS and the MMOS, we were tackling the operations breakdowns. The next step was increasing Employee engagement. We needed engaged, enthusiastic people on the line in order for this to work.
Enhancing Employee communication. We were especially focused on communications between managers at shift changes. Everyone needed to be on the same page.
USC Tactics
At USC Consulting Group, we don’t pronounce edicts for change from the company boardroom. The whole key to our process is involving everyone, from higher ups to the people on the line, to get to the root of the problems and arrive at solutions. For this client, it looked like this:
USC Prototype Process. We started the change process at one work center, engaging the Employees and support functions as we enhanced and developed the necessary tools to improve plant Efficiency.
Fish Bone process (5Ms). The Fish Bone is a highly effective method of getting at the root of efficiency problems. It is, basically, a guided brainstorming session in which we brought in key players from all levels of the company and focused on five areas:
1. Materials. Are supply chain bottlenecks bedeviling efficiency?
2. Methods. Can we make processes more efficient?
3. Machine. Are the machines running the way they should?
4. Measurements. How do we know what success looks like?
5. Manpower (now called Crewing). Are Employees trained and engaged?
We did this brainstorming process, addressing the 5Ms, and then went out onto the line to see these issues in action. That gave it an extra punch. Not only did it clarify issues and actions we needed to take, but it enhanced communication between Employees as well. We had shift supervisors brainstorming together, creating a bond that increased their communication on the job.
Operator training with certificates of achievement. We found manuals with pictures, but there had been high turnover and nobody was using those old manuals anymore. With these manuals, a formalized training process was developed and deployed to add skill to a new workforce. Issuing certifications was a powerful part of this process. Employees who had successfully completed the training got certified, which gave them a new level of pride in themselves and their achievements.
Preventative maintenance overhaul. USC looked at the work order history for the past 12 months. We found their instructions for maintenance were very low level, generic, and didn’t address what needed to be addressed. For one of their machines that broke down constantly, it was just changing an air filter once a year. That was not the kind of maintenance it needed. So we talked to their most experienced operators about problems they were seeing, and identified the type of preventative maintenance they needed, based on the problems that kept recurring. It also required a cultural habits change. The company was used to putting out fires, not preventing them. But they needed to shift to taking a small hit during preventative maintenance downtimes to prevent future breakdowns.