Your visit, your choice

We use Clarity and Leadfeeder only with your permission. Cookie policy

Vertically integrated pork producer, Food & Beverage case study

Case study · Food & Beverage

Pork producer gains $16M in annualized benefits from yield, labor and overtime

A vertically integrated pork producer wanted better yield and productivity. After more than 700 hours of observation, USC used employee-involvement prototyping in live operations to remove waste, set run standards and speed shift start-ups.

Results

$16M

in annualized benefits

The producer launched three further initiatives with USC.

The situation

Yield and productivity across the pork producer's operations were below where the company wanted them, and overtime was adding cost.

What the assessment found

  • Gaps in the management operating system
  • Manual scheduling and slow shift starts
  • Unmeasured rework
  • Maintenance run to failure

How the work was done

Waste: prototype in live operations

Used USC's Employee Involvement Prototype, a shift-by-shift trial of changes with the crews who do the work, to remove waste while the plant kept running.

Standards: run at the optimum

Set optimum run parameters and standard work, and sped up start-ups.

Management: coach and audit

Upgraded key performance indicators, coached on the floor and ran post-project audits.

$16M

in annualized benefits

Lasting impact

The producer realized $16 million in annualized benefits and went on to three further initiatives with USC.

Related case studies

Slow start-ups and rework nobody measures?