Case-ready plant, 40 production lines, Food & Beverage case study

Case study · Food & Beverage

Case-ready meat plant saves $16M with a real-time management operating system

A four-year-old case-ready beef and pork plant needed better line efficiency across 40 production lines. The company brought USC back to install a management operating system with real-time line tracking.

Results

$16M

in savings at one plant

24%

increase in labor productivity per hour

16%

increase in throughput

Results are for one plant; the system later went to two more.

The situation

The plant packed more than two million pounds of beef and pork a week for a single customer, a nationwide supermarket chain. With 40 lines, many products, a highly automated packaging department and a variable product mix, it needed a management operating system covering production, maintenance interfaces, planning and scheduling.

What the assessment found

  • No effective management operating system across 40 lines and a variable product mix
  • Downtime causes not visible to supervisors as they happened
  • Excess tray and packaging inventory in the warehouse

How the work was done

Lines: track results in real time

Paired process improvement with USC's Lean Information Control System (LINCS) to show supervisors real-time production and downtime on every filling and packaging line.

16%

increase in throughput

Downtime: rank and remove causes

Used Pareto analysis and action management to eliminate downtime causes, and trained managers and supervisors in clean-in-place procedures.

24%

increase in labor productivity per hour

Support: trays and packaging

Improved the areas supplying trays to the lines and cut excess tray and packaging inventory in the warehouse.

30%

reduction in packaging waste

“Based on the success we've experienced locally, we plan to extend the LINCS® business intelligence solution across all three of our case ready plants.”
Group Senior Vice President

Lasting impact

Plant managers could manage minute by minute or by shift, day or week, and yields rose 3%. The company then extended the system across all three of its case-ready plants.