Case study · Energy & Utilities
Waste-to-energy producer saves $3M a year by cutting overtime across U.S. plants
Overtime averaged 20% of labor cost across a waste-to-energy producer's U.S. plants, and up to 35% at some. USC piloted new labor practices at four plants, then extended them across 28 facilities.
Results
$3M
in annual overtime savings
93,000 hours
reduction in labor a year, across 28 facilities
Savings and hours are annual.
The situation
Running around the clock, the plants built overtime into labor cost to cover holidays and sick days, and maintenance outages, upgrades and installations added more. Overtime averaged 20% across the plants and reached 35% at some.
What the assessment found
- Maintenance and training scheduled into peak periods
- No relief coverage for paid time off, so time off became overtime
How the work was done
Pilot: prove it at four plants
Started at four facilities with a new management operating system that added checks, balances and feedback on how work is assigned internally and to contractors.
Maintenance: stagger the work
Analyzed backlogs and historical maintenance overtime, then staggered schedules so peak periods had capacity without overtime.
Shifts: cover time off differently
Moved training to quieter periods, hired a relief operator qualified across roles to cover paid time off, and shifted some equipment runs to cut electricity costs.
Reporting: keep the savings
Installed the process analysis and reporting module of USC's Lean Information Control System (LINCS) to sustain the savings and support further improvement.
Lasting impact
Practices proven at four pilot plants spread across 28 U.S. facilities, saving 93,000 labor hours and $3 million a year, with reporting in place to keep the savings.
Related case studies
Energy & Utilities
Midstream oil and gas company cuts $15.2M in expenses after rapid acquisitions
$15.2Min total expense reductions
Read the case study →Energy & Utilities
Energy equipment maker delivers an $18.4M turnaround and doubles productivity
$18.4Mturnaround, reaching break-even against budget
Read the case study →Energy & Utilities
Steel products maker cuts lost-time incidents 50% with a new safety system
50%reduction in lost-time incidents
Read the case study →