Waste-to-energy plants on three continents, Energy & Utilities case study

Case study · Energy & Utilities

Waste-to-energy producer saves $3M a year by cutting overtime across U.S. plants

Overtime averaged 20% of labor cost across a waste-to-energy producer's U.S. plants, and up to 35% at some. USC piloted new labor practices at four plants, then extended them across 28 facilities.

Results

$3M

in annual overtime savings

93,000 hours

reduction in labor a year, across 28 facilities

Savings and hours are annual.

The situation

Running around the clock, the plants built overtime into labor cost to cover holidays and sick days, and maintenance outages, upgrades and installations added more. Overtime averaged 20% across the plants and reached 35% at some.

What the assessment found

  • Maintenance and training scheduled into peak periods
  • No relief coverage for paid time off, so time off became overtime

How the work was done

Pilot: prove it at four plants

Started at four facilities with a new management operating system that added checks, balances and feedback on how work is assigned internally and to contractors.

Maintenance: stagger the work

Analyzed backlogs and historical maintenance overtime, then staggered schedules so peak periods had capacity without overtime.

Shifts: cover time off differently

Moved training to quieter periods, hired a relief operator qualified across roles to cover paid time off, and shifted some equipment runs to cut electricity costs.

Reporting: keep the savings

Installed the process analysis and reporting module of USC's Lean Information Control System (LINCS) to sustain the savings and support further improvement.

Lasting impact

Practices proven at four pilot plants spread across 28 U.S. facilities, saving 93,000 labor hours and $3 million a year, with reporting in place to keep the savings.