Vinyl siding maker cuts material giveaway 42% across its extrusion lines

A building products maker's vinyl siding scrap ran above 25%, with gauge and additive use well above industry standards. USC and client teams prototyped Six Sigma and Lean fixes on one extrusion line, then rolled statistical process control (SPC) out to all lines.

Results

42%

reduction in overall giveaway

18%

reduction in ASA coating scrap

13%

reduction in PVC coating scrap

Scrap had exceeded 25% before the project.

The situation

Scrap in the siding division ran above 25%, and gauge thickness and the use of PVC and ASA color additives were well above industry standards. Together they were seriously eroding the division's profitability.

What the assessment found

  • Process variation too high to cut giveaway safely

How the work was done

Prototype: one line first

Started on one extrusion line producing 15% of siding output, with four joint improvement teams working separate charters on cap stock, gauge, variation and scrap.

Variation: control the process

Used gage studies, 5S, attribute agreement analysis and statistical process control limits by product family, built from historical data.

42%

reduction in overall giveaway

Rollout: train every line

Trained operators, supervisors, engineers, inspectors and senior staff in SPC before deploying it to every production line.

“I was very familiar with USC Consulting Group based on work they had previously performed for me at another building products company so I knew I could count on them to get the job done.”
CEO

Lasting impact

Operators gained better control of the process, and SPC drove lasting reductions in variation and scrap across the siding lines.