Global skin care manufacturer, Manufacturing case study

Case study · Manufacturing

Skin care maker raises throughput 27% ahead of new product launches

Expecting volume growth from new launches, a prescription and over-the-counter skin care maker needed its manufacturing and labs to run smoothly together. USC installed scheduling, closed-loop operating systems and lab capacity controls.

Results

27%

increase in throughput

26%

improvement in manufacturing schedule attainment

50%

reduction in average quality control (QC) lab cycle time

Analytical lab cycle time fell 36% and raw materials inventory 10%.

The situation

The company expected significant volume increases from planned launches. With a long overall cycle time and many handoffs between manufacturing and testing labs, it needed a smooth internal supply chain to deliver.

What the assessment found

  • Obsolete and expired goods taking warehouse space
  • Lab workloads not measured against capacity

How the work was done

Scheduling: build and track

Introduced a master production schedule, daily and weekly build schedules, and daily and weekly reporting of schedule attainment.

26%

improvement in schedule attainment

Pharmacy: close the loop

Installed a closed-loop operating system for planning, execution, follow-up and reporting, with batch-size controls to meet shelf-life goals.

Labs: match work to capacity

Added input-output volume controls and visual work order management in the QC, analytical and microbiology labs, with weekly capacity models.

50%

reduction in QC lab cycle time

Warehouse: clear the obsolete

Set up timely removal of obsolete and expired goods to free warehouse space.

“The project results were so significant that we were able to secure additional business in an environment where a few months earlier we had thought we were at maximum capacity.”
Chairman and CEO

Lasting impact

Weekly management reviews of lab key performance indicators and a closed-loop operating system kept the improvements in place.