Case study · Manufacturing
Silicon components maker raises quarterly shipments from $70M to $105M
Rising demand and COVID-19 left a silicon components maker's two facilities short of throughput. USC, back after an earlier operating system project, managed each site's constraints and helped lift quarterly shipments to $105 million.
Results
$105M
Q4 shipments, up from $70M a year earlier
$97M
Q3 shipments, up from $60M a year earlier
Each quarter is compared with the same quarter a year earlier.
The situation
A perfect storm, including COVID-19, left the manufacturer's throughput suffering at two facilities while demand climbed every quarter. The goal: get on pace to double throughput by year end and build in-process inventory to support it, by maximizing existing capacity and adding capacity at each site.
What the assessment found
- Work centers underutilizing capacity
- In-process inventory too low for the planned output
- Bottlenecks unclear without each operation's theoretical maximum
How the work was done
Diagnosis: find the constraint
Ran a T-Max (theoretical maximum) diagnostic on each work-center grouping to locate bottlenecks against each operation's optimal capability.
Constraints: manage four pillars
At each site's constrained operations, managed equipment availability, parts waiting at the constraint, staffing and escalation.
System: track daily and weekly
Built a constraint-centric management system that tracked daily and weekly targets by site and product line, capturing causes of downtime and low work in process.
Before and after
Q3 shipments
+62%
Q4 shipments
+50%
Each quarter is compared with the same quarter a year earlier.
Lasting impact
Both facilities ran to their constraints with daily and weekly targets in view, and shipments grew sharply year over year as demand kept climbing.
Related case studies
Manufacturing
Control systems maker adds $1.5M annual revenue, cuts labor cost per job 51%
$1.5Mincrease in annual revenue
Read the case study →Manufacturing
Pulp and paper maker cuts bleach chemical costs $2M a year at one mill
$2Min annual bleach chemical savings at one mill
Read the case study →Manufacturing
PE firm's manufacturing holding cuts $6M a year and creates $36M in value
$6Min annualized cost savings
Read the case study →