Two-facility silicon components manufacturer, Manufacturing case study

Case study · Manufacturing

Silicon components maker raises quarterly shipments from $70M to $105M

Rising demand and COVID-19 left a silicon components maker's two facilities short of throughput. USC, back after an earlier operating system project, managed each site's constraints and helped lift quarterly shipments to $105 million.

Results

$105M

Q4 shipments, up from $70M a year earlier

$97M

Q3 shipments, up from $60M a year earlier

Each quarter is compared with the same quarter a year earlier.

The situation

A perfect storm, including COVID-19, left the manufacturer's throughput suffering at two facilities while demand climbed every quarter. The goal: get on pace to double throughput by year end and build in-process inventory to support it, by maximizing existing capacity and adding capacity at each site.

What the assessment found

  • Work centers underutilizing capacity
  • In-process inventory too low for the planned output
  • Bottlenecks unclear without each operation's theoretical maximum

How the work was done

Diagnosis: find the constraint

Ran a T-Max (theoretical maximum) diagnostic on each work-center grouping to locate bottlenecks against each operation's optimal capability.

Constraints: manage four pillars

At each site's constrained operations, managed equipment availability, parts waiting at the constraint, staffing and escalation.

System: track daily and weekly

Built a constraint-centric management system that tracked daily and weekly targets by site and product line, capturing causes of downtime and low work in process.

Before and after

Q3 shipments

Before: $60M
After: $97M

+62%

Q4 shipments

Before: $70M
After: $105M

+50%

Each quarter is compared with the same quarter a year earlier.

Lasting impact

Both facilities ran to their constraints with daily and weekly targets in view, and shipments grew sharply year over year as demand kept climbing.