Railcar lessor ships 43% more cars from its maintenance shops

Rising demand and strict federal rules had slowed railcar servicing for an international lessor. USC prepared car files before arrival, improved material flow and built a management operating system, then was retained for three more engagements.

Results

43%

increase in cars shipped

23%

reduction in hours per car

20%

improvement in crossover labor

Results held across three follow-on engagements.

The situation

Rising fuel costs drove demand for the lessor's tank cars, hoppers and flatbeds, and strict federally mandated procedures added to servicing time, so inspection, cleaning, repair, lining and painting all took too long.

What the assessment found

  • Direct labor spending time on indirect activities
  • Material not ready before repairs began
  • Car files prepared only after cars arrived

How the work was done

Prep: ready before arrival

Moved car file preparation, cleaning, inspection and estimating ahead of the inbound date, speeding cars through the shop.

23%

reduction in hours per car

Flow: material at the repair

Prototyped employee-suggested changes that improved material availability and flow before repairs, plus better shift startup and car switch planning.

20%

improvement in crossover labor

System: show the variances

Installed process monitors and area performance boards, reviewed variances in daily shift meetings, and built delay tracking and root cause analysis into the operating system.

43%

increase in cars shipped

“There was no comparison. You guys were our benchmark that the others couldn’t measure up to.”
SVP of maintenance operations

Lasting impact

Based on the pilot's success, the lessor retained USC for three more engagements to roll the practices out to its other North American service centers, with equally strong results.