High-tech defense engineering firm, Aerospace & Defense case study

Case study · Aerospace & Defense

Defense engineering firm cuts build time 32% and rework 45% after a knowledge drain

Expanding internationally, a high-tech defense engineering firm cut costs through layoffs and early retirements, losing senior managers and control. USC redesigned its business processes with cross-functional teams, cutting build time, rework and WIP.

Results

32%

reduction in build time

45%

reduction in drawings returned for rework

40%

increase in on-time releases

Drawing cycle time fell 25% and work-in-process inventory 50%.

The situation

Moving into international defense markets brought tougher competition and margin pressure, and management cut costs through early retirements and layoffs.

What the assessment found

  • Knowledge and managerial control lost with departing senior managers
  • Unreliable schedules across shared engineering and manufacturing
  • Programs competing for parts and overloading preemptively
  • Drawings often returned for rework

How the work was done

Root causes: find the waste

Led root cause analysis with key managers to identify the delays, mistakes and misunderstandings driving up cost.

Engineering: fix design services

Formed a cross-functional team to improve coordination and timing for material planning, using ideas from USC's Employee Involvement Prototype sessions, shift-by-shift trials of changes with the people who do the work.

45%

reduction in drawings returned for rework

Reporting: measure and share

Set up regular progress reporting and metrics the teams adopted readily, tracking productivity, releases and defects.

40%

increase in on-time releases

“We had to get past the fear of being measured to embrace the attitude of continuous improvement.”
Engineering director

Lasting impact

Commitment to the goals grew as everyone saw build times and defects fall, and the teams embraced continuous improvement.