Defense engineering firm cuts build time 32% and rework 45% after a knowledge drain
Expanding internationally, a high-tech defense engineering firm cut costs through layoffs and early retirements, losing senior managers and control. USC redesigned its business processes with cross-functional teams, cutting build time, rework and WIP.
Results
32%
reduction in build time
45%
reduction in drawings returned for rework
40%
increase in on-time releases
Drawing cycle time fell 25% and work-in-process inventory 50%.
The situation
Moving into international defense markets brought tougher competition and margin pressure, and management cut costs through early retirements and layoffs.
What the assessment found
- Knowledge and managerial control lost with departing senior managers
- Unreliable schedules across shared engineering and manufacturing
- Programs competing for parts and overloading preemptively
- Drawings often returned for rework
How the work was done
Root causes: find the waste
Led root cause analysis with key managers to identify the delays, mistakes and misunderstandings driving up cost.
Engineering: fix design services
Formed a cross-functional team to improve coordination and timing for material planning, using ideas from USC's Employee Involvement Prototype sessions, shift-by-shift trials of changes with the people who do the work.
45%
reduction in drawings returned for rework
Reporting: measure and share
Set up regular progress reporting and metrics the teams adopted readily, tracking productivity, releases and defects.
40%
increase in on-time releases
“We had to get past the fear of being measured to embrace the attitude of continuous improvement.”
Lasting impact
Commitment to the goals grew as everyone saw build times and defects fall, and the teams embraced continuous improvement.
Related case studies
Aerospace & Defense
Airline saves $5M a year by cutting maintenance cycle times 20%
$5Min annual maintenance savings
Read the case study →Aerospace & Defense
Utility aircraft maker frees $750K in working capital by resetting supplier terms
$750Kin working capital freed
Read the case study →Aerospace & Defense
Major airline returns $22M+ by standardizing hangar operations without adding resources
$22M+in financial returns
Read the case study →