Airline saves $5M a year by cutting maintenance cycle times 20%
A large domestic airline's new maintenance facility wasn't delivering the value it was built for. USC prototyped a new process in a single bay, then rolled it out across the facility, cutting cycle times and cost per visit.
Results
$5M
in annual maintenance savings
20%
reduction in aircraft cycle times
15%+
reduction in cost per maintenance visit
Savings are annual.
The situation
Facing tough competition, the airline needed to cut expenses. Its new state-of-the-art maintenance facility was underperforming: processes were inefficient and critical path management was weak, keeping visit costs for its 737 fleet too high.
How the work was done
Prototype: prove it in one bay
Gathered ideas from managers, team leaders and leads on every shift, then planned and ran a new process in a single bay to work out the kinks.
Critical path: manage it across the facility
Reconfigured the maintenance bays, revamped the organization, and refined planning and reporting tools to manage the critical path and workloads.
20%
reduction in aircraft cycle times
Leaders: manage visually
Installed visual management of turnaround times and upgraded management skills through training and on-the-floor coaching.
15%+
reduction in cost per visit
Lasting impact
The airline got the value it needed from its facility, and the best practices were later rolled out across its other maintenance operations, generating further savings.
Related case studies
Aerospace & Defense
Utility aircraft maker frees $750K in working capital by resetting supplier terms
$750Kin working capital freed
Read the case study →Aerospace & Defense
Major airline returns $22M+ by standardizing hangar operations without adding resources
$22M+in financial returns
Read the case study →Aerospace & Defense
Utility aircraft maker cuts its multi-million-dollar freight spend 40%
40%reduction in freight spend
Read the case study →