Large domestic airline, 737 fleet, Aerospace & Defense case study

Case study · Aerospace & Defense

Airline saves $5M a year by cutting maintenance cycle times 20%

A large domestic airline's new maintenance facility wasn't delivering the value it was built for. USC prototyped a new process in a single bay, then rolled it out across the facility, cutting cycle times and cost per visit.

Results

$5M

in annual maintenance savings

20%

reduction in aircraft cycle times

15%+

reduction in cost per maintenance visit

Savings are annual.

The situation

Facing tough competition, the airline needed to cut expenses. Its new state-of-the-art maintenance facility was underperforming: processes were inefficient and critical path management was weak, keeping visit costs for its 737 fleet too high.

How the work was done

Prototype: prove it in one bay

Gathered ideas from managers, team leaders and leads on every shift, then planned and ran a new process in a single bay to work out the kinks.

Critical path: manage it across the facility

Reconfigured the maintenance bays, revamped the organization, and refined planning and reporting tools to manage the critical path and workloads.

20%

reduction in aircraft cycle times

Leaders: manage visually

Installed visual management of turnaround times and upgraded management skills through training and on-the-floor coaching.

15%+

reduction in cost per visit

Lasting impact

The airline got the value it needed from its facility, and the best practices were later rolled out across its other maintenance operations, generating further savings.