Cement maker saves $4.2M across three plants by cutting maintenance costs 20%

A global building products company wanted proven maintenance practices working across its cement plants. USC rebuilt work order management, preventive maintenance plans and shutdown preparation, then rolled the practices out to more plants.

Results

$4.2M

in maintenance savings across three plants

20%

reduction in maintenance costs

15%+

increase in throughput

Throughput gains came from better equipment reliability and utilization.

The situation

Proven maintenance practices are well known in cement, but making them work across several plants is hard. The company wanted lower costs for repairs and preventive work, less use of outside contractors for recurring problems and longer life from replacement parts, targeting a 20% cut in maintenance cost per ton.

What the assessment found

  • Preventive maintenance plans due for review on major equipment
  • Spare parts costs not managed systematically

How the work was done

Work orders: plan the work

Built work order management, maintenance planning, back-order management and daily planning and review with the company's operational excellence group.

20%+

reduction in work order backlogs

Preventive maintenance: rewrite the plans

Reviewed preventive maintenance frequencies, tasks and job plans for virtually all major equipment and added a fuller set of maintenance metrics.

Shutdowns: prepare and stage

Improved material preparation, kitting and staging; one plant's annual shutdown ran two days shorter with record work-order attainment.

Spares: cut the annual cost

Introduced a systematic approach to reducing the annual cost of spare parts.

“We were able to combine our technical know-how with USCCG's implementation expertise to generate significant savings in parts, labor and outside contractor fees.”
Vice President of Manufacturing

Lasting impact

One plant's annual shutdown was its best ever, with the fewest start-up issues afterward. The practices then spread to three other plants, and maintenance costs fell 20%.