1Challenge
Overfilled packages and untracked losses cost an estimated $20M a year across four plants, crews did not follow SOPs, and no optimal throughput target existed.
2Approach
- Upgraded the yield MOS and added SPC charting to cut overage waste
- Strengthened PDCA cycles, work-to-time relationships, capacity planning and shift playbooks
- Set a throughput target from the top 10 run rates for high-performing SKUs
3Results
$2.4M
Projected annualized savings from crewing
$1.2M
Projected annualized savings from yield and throughput
$3.6M
Expected total savings
OEE reporting now ties directly into the MOS and daily and weekly reviews.