1Challenge
After expanding a meat plant, the client wanted better product flow and yield without additional cost.
2Approach
- Studied trimmer methods and redesigned workstations and technique
- New end-cutting fixture and cooking controls cut over-target weight to 0.2%
- Supervisor training in waste elimination, SPC and control systems
3Results
68%
More meat trimmed per lb/hr
2.2% | 6.4%
Final | trim yield
46%
Less raw end-piece loss
80%
Less cooked product over target
Results within six weeks; 'measurable, consistent and continuing.'