Narrow-vein underground gold mine, Mining & Metals case study

Case study · Mining & Metals

Underground gold mine cuts cost per ounce 19% and raises production 22%

A narrow-vein underground gold mine kept missing its production plan. USC built a closed-loop management operating system for its long-hole mining that turned data into decisions.

Results

19%

reduction in cost per ounce

22%

increase in production

36%

reduction in paste fill cost per ton

Cost per ton fell 3.6% and attainment to budget rose 13%.

The situation

The mine had fallen 60,000 tons short, averaging 85% attainment to plan over two years.

What the assessment found

  • An operating system whose data wasn't turned into information for decisions
  • Supervisors' routines heavy in non-value-added work

How the work was done

Planning: set realistic volumes

Upgraded short-term planning for every major mining activity and built zero-based capacity planning from unit cycle times.

25%

improvement in attainment to the mucking plan

Supervisors: free time to lead

Revised supervisors' roles and daily routines to cut non-value-added work and give them more time to lead their teams.

Data: decide faster

Turned operating data into timely information, reducing surprises at the face that had led to unsafe shortcuts.

60%

increase in paste fill throughput an hour

“USC identified and helped us fill the gaps and disconnects in our operating system that were contributing to sub-optimal performance. Without them we would have continued to struggle despite our best efforts.”
General manager of the mine

Lasting impact

Mine team members were trained to run the management operating system for year-over-year gains, and post-project audits showed the improvements held over the long term.