Multi-pit gold operation, Southern Patagonia, Mining & Metals case study

Case study · Mining & Metals

Gold miner's highest-cost site becomes its lowest-cost, with a 9.7:1 return

A South Africa-based gold miner's multi-pit operation in Southern Patagonia had the highest cost per ounce in its group. USC worked shift by shift with mill crews to stabilize milling and recovery and build a maintenance operating system.

Results

9.7:1

return on investment

72%

reduction in daily mill downtime hours

5.4%

increase in gold recovery

Silver recovery rose 12%.

The situation

Of all the group's operations, this one cost the most to produce an ounce of gold, and the losses showed at the mill, where milling and recovery were unstable.

What the assessment found

  • No effective maintenance operating system at the mill
  • Operating parameters not defined
  • Preventive maintenance and recovery below potential

How the work was done

Variability: find the causes

Ran USC's Employee Involvement Prototype, a shift-by-shift trial of changes with the crews who do the work, to find the root causes of variability.

Roles: coordinate the crews

Refined cross-functional roles and coordination between operations and maintenance.

72%

reduction in daily mill downtime hours

Mill: stabilize recovery

Stabilized milling and recovery with defined parameters and better preventive maintenance.

5.4%

increase in gold recovery

Lasting impact

The site went from the group's highest cost per ounce to its lowest.

Related case studies

Is one site dragging down your cost per ounce?