Copper-zinc mine, Horn of Africa, Mining & Metals case study

Case study · Mining & Metals

Copper-zinc miner raises equipment availability 66% with a 14:1 return

A Canadian mid-tier miner needed to lower cost per tonne at its copper-zinc asset in the Horn of Africa. USC upgraded work order management and built front-line supervisors.

Results

66%

increase in equipment availability

14:1

return on investment

40%

improvement in mean time to repair

Throughput rose 6%.

The situation

The site needed more reliable plant and mobile equipment and a stronger supply chain to bring cost per tonne down.

How the work was done

Work orders: upgrade the system

Built a new game plan to close gaps and upgraded work order management.

40%

improvement in mean time to repair

Integration: bring support together

Integrated safety, process engineering and supply chain improvements.

Supervisors: build capability

Built front-line supervisor capabilities to sustain the new routines.

66%

increase in equipment availability

Lasting impact

Reliability gains flowed through to a lower cost per tonne.