Your visit, your choice

We use Clarity and Leadfeeder only with your permission. Cookie policy

Flagship open-pit copper mine, Mining & Metals case study

Case study · Mining & Metals

Copper mine cuts cost per ton 23% and mines 22% more tons

The flagship open-pit mine of a low-cost copper producer had improvement initiatives under way but wasn't seeing results fast enough. USC ran a two-week feasibility study, then implemented Kaizen, total productive maintenance and statistical process control.

Results

23%

reduction in mine cost per ton

22%

increase in tons mined

7.1%

increase in concentrate grade

Feasibility study estimates were met and exceeded.

The situation

Management at the large open-pit mine had already launched improvement initiatives, but results were coming too slowly, and copper recovery from milled tonnage was a particular concern.

What the assessment found

  • Flotation densities hard to hold within target
  • Loaders, shovels and trucks not synchronized in dispatch

How the work was done

Involvement: work with the crews

Developed recommendations with mine personnel using Kaizen, total productive maintenance and employee involvement prototyping.

23%

reduction in mine cost per ton

Flotation: control the process

Trained mill control room operators in statistical process control to keep flotation within target for cleaner densities.

7.1%

increase in concentrate grade

Dispatch: synchronize the pit

Process-mapped the dispatch system with dispatchers and synchronized loaders, shovels and trucks.

15%+

increase in tonnage

Lasting impact

Costs dropped and the mine set new benchmarks for milled tons per day, tons mined, pounds of copper produced, recovery and concentrate grade.

Related case studies

Improvement program running, but results too slow?