1Challenge
Scrap exceeded 25%, and gauge distribution plus PVC and ASA additive usage were well above industry standards.
2Approach
- Used one extrusion line, about 15% of siding output, as the prototype for all lines
- Ran four joint CI teams using closed-loop problem solving and Lean Six Sigma tools such as Gage R&R and 5S
- Set SPC limits by product family and trained operators through senior staff before full rollout
3Results
42%
Reduction in overall giveaway
13%
Less scrap from PVC coating variation
18%
Less scrap from ASA coating variation
The CEO brought USC back after earlier results at another building-products company.